file The latest on the VCT bridge replacement

  • Andy Ballentine (ABallentine)
  • Andy Ballentine (ABallentine)'s Avatar Topic Author
  • Offline
More
17 Dec 2025 18:54 #1050 by Andy Ballentine (ABallentine)
The latest on the VCT bridge replacement was created by Andy Ballentine (ABallentine)
Here's the latest announcement from the Virginia Capital Trail Foundation about the twice postponed bridge replacement:

A section of the Trail between MM 3 & MM 4 in James City County will be closed starting January 5th for approximately 2 to 3 weeks as VDOT replaces the bridge deck and substructure.

Please Log in to join the conversation.

Time to create page: 0.262 seconds